what setting dictates whether a pipeline can have two simultaneous jobs?

LabKey Support Forum (Inactive)
what setting dictates whether a pipeline can have two simultaneous jobs? Ben Bimber  2011-04-01 13:22
Status: Closed
 
we have a pipeline this is configured to execute the runs on a separate server. we're starting to get more usage on it. i originally thought the pipeline was setup such that only one run could execute at once. any subsequent runs would be queued until the first one completed. that's not what's happening. is there some setting to configure this to be the case?

it isnt causing problems for now, since the most i'm seeing 2-3 runs simultaneously. i'd prefer not to see 10 though.

thanks in advance.
 
 
jeckels responded:  2011-04-01 14:41
Hi Ben,

There are different default numbers for simultaneous jobs depends on the machine. The web server defaults to one at a time. A remote server defaults to 4 at a time. If needed, we can help craft up an alternate Mule (the workflow engine we're using) XML configuration file to do something different.

Thanks,
Josh